Typically, pools winterized with E-Z Pool™ will be clear when uncovered with some settled debris on the bottom. Please follow these easy instructions for the re-opening of these winterized pools:

Re-fill pool to operating level and begin circulating. Continue circulation 24 hrs. a day until restart is completed.

Opening with algae present: (this should be the exception, not the rule)

Shock with chlorine first at a level that will clean up algae growth.
Generally start with ½ lb. of dichlor per 10,000 gallons.
Wait 24 hours after any chlorine shocking then proceed to instructions "Opening clear"

Opening clear: (no algae present)

  1. Balance pool water to acceptable E-Z Pool™ parameters – pH 7.6,
    TA 80-120 ppm., Calcium 350-400 ppm.
  2. Sequester if metals are present (especially if well water is used to refill).
  3. Brush walls and vacuum pool to waste.
    Treat with E-Z Pool™ according to regular “Weekly Dosage Instructions”
    and add chlorine puck(s) to skimmer or feeder.
  4. For optimal season performance, chemically clean filter after the first
    week of operation, since E-Z Pool™ may load a lot of winter debris
    into the filter. This step should definitely be taken if algae was present
    upon re-opening.

Follow regular weekly maintenance routine. Have a GREAT SUMMER!!!